Maintenance Window Audit

A full-site review of your fleet that produces a ranked maintenance calendar tied to your electricity tariff and unit failure history.

Maintenance Window Audit
FormatOn-site assessment
Duration2–4 days depending on fleet size
LocationGyeongsang region and nationwide by arrangement
PricingFrom ₩1,800,000 for fleets under 50 units

Who This Is For

Operators running 20 or more units at 0.05 PH/s or above who lose measurable hashrate every month to unplanned fan replacements, hashboard swaps, or filter cleaning. If your technicians arrive whenever something breaks, this audit gives them a calendar.

What You Receive

  • A walk-through of every rack, container, or immersion tank on site
  • Per-unit notes on wear patterns: fans, hashboards, power supplies, cabling
  • A four-week maintenance calendar aligned to your off-peak electricity hours
  • A parts list with lead times for the three most likely failures in your fleet
  • A one-hour follow-up call two weeks after delivery to adjust the schedule

What Is Not Included

We do not perform repairs during the audit itself. We do not sell hardware or parts. The audit is a planning document — your team or contracted technicians execute the work.

Process

  1. Intake call — You share fleet inventory, power contract hours, and recent failure logs.
  2. Site visit — Two technicians spend one to three days on site depending on unit count.
  3. Draft report — Delivered within five business days as a PDF with the maintenance calendar.
  4. Revision — One round of adjustments based on your feedback at no extra charge.

Preparation

Have your last three months of downtime logs ready. Ensure at least one staff member who knows the electrical layout can walk our team through the facility. Units do not need to be powered down for the initial walk-through.

Next Step

Submit a request through our contact form with your fleet size and location. We respond within two business days with a scoped quote.

Request This Service